HTH · Klutch AI ImplementationKlutch Cannabis Master Page

HTH domain — NOT AROYA · High Tech Horticulture LLC · Retainer live since 2026-07-06
Synced

30-SECOND DASHBOARD

Session
1 of ~10
MISSED at 10:15 PT today — reschedule pending
Next milestone
Reschedule S1
Draft reply 19fa9de3314a438b still UNSENT (in Drafts)
Retainer runway
$5,000 / 33 hr
~$150/hr · burn est. 0.5-1 hr (prep + no-show)
Cian owes this week
Send reschedule
+ agenda + repo template to Rob/Mike/George
Klutch owes this week
Confirm new slot
Rob + Mike availability windows

Snap read: Cian missed the 10:15 PT S1 slot because the Google Cal invite went out without Rob's email and no follow-up ping. Draft apology in HTH gmail exists but has NOT been sent. Next action = send draft 19fa9de3314a438b to Rob (Cc Mike + George).

1. Stakeholder Registry source of truth · auto-Cc floor

Rule per feedback_klutch-auto-cc-stakeholders: every Klutch email + meeting invite Cc's the ALWAYS set unless Cian names a smaller subset. Contact-editable cells persist via the sync worker.

ALWAYS · 3 OPTIONAL · 3 EXCLUDE · 2 Ambiguous · 4 (pending Cian input)
NameRoleEmailPhoneCc ruleNotes (editable)
Mike Lentz
first 2026-06-12
VP Production OperationsMike.Lentz@
klutchcannabis.com
+1-330-907-4634ALWAYS
Primary sponsor. Owns the $5K retainer. Accepted S1 twice on 7/27.
Rob Walker
first 2026-06-18
VP Information Technologyrob.walker@
klutchcannabis.com
+1-330-866-0762ALWAYS
Technical counterpart. Owns Ubuntu Hyper-V sandbox + Anthropic API + SharePoint POC. Standing weekly session partner.
George Strickler
first 2026-06-15
Evaluator — accounting / reporting / future integrationsGeorge.Strickler@
klutchcannabis.com
ALWAYS
Intro'd 6/15 by Mike. Not confirmed for S1. Zero direct replies to date — but on the invite / recipient set.
Neal Ritondaro
first 2026-07-03
Treasury Analyst | AccountingNeal.Ritondaro@
klutchcannabis.com
+1-330-801-5438OPTIONAL
Include only on payment / invoice / vendor-setup topics. Cleared retainer 7/6.
Renee Sebestyen
first 2026-07-07
Compliance SupervisorRenee.Sebestyen@
klutchcannabis.com
+1-330-622-1910OPTIONAL
METRC / StashStock / compliance lane. Include on Phase 2 (METRC + inventory) sessions.
Pete Nischt
first 2026-07-07
Klutch (title unconfirmed — compliance-adjacent)Pete.Nischt@
klutchcannabis.com
OPTIONAL
On the StashStock Cc. Verify title before promoting.
accounting@klutchusa.comAP inbox (Stripe verification)accounting@
klutchusa.com
EXCLUDENot a human. Stripe microdeposit target only.
legal@klutchcannabis.comLegal escalation addresslegal@
klutchcannabis.com
EXCLUDEBoilerplate footer. Use only for formal SOW / NDA action.
Ambiguous — pending Cian input (4)

2. Communication Timeline newest first · click to expand

3. Project Spine — 10-Session Curriculum

Session 1 · Tue 2026-07-28 · 10:15–11:15 AM PT · MISSED

Planned block: sandbox walk-through → shared repo + Claude Code on VM → 30-day anchor → open Argus/network questions. Full prep at klutch-session1-prep-2026-07-28.md.

Why missed: Cian's Google Cal invite went out without Rob's email; Mike accepted but no group-attended session materialized at 10:15 PT. Cian's apology draft 19fa9de3314a438b was written 10:55 PT but sat in Drafts.

Recovery: send draft, propose new 60-min slot before Cian's Spokane flight window closes. Retainer clock cost of no-show ≈ 0 hours (prep already logged separately).

Session 2 · TBD · 60 min

Same 4-block spine as S1: sandbox → repo + Claude Code → 30-day anchor pick → Argus questions. Rob keyboards the Claude Code install.
Add notes…

Sessions 3-10 · templated

  1. Kickoff + repo governance + GitHub workflow on the Ubuntu VM
  2. Claude Code + Cowork on the VM, hands-on with Rob driving
  3. Agent/bot architecture + skill patterns tuned to Klutch workflows
  4. AROYA API pipeline into a Klutch-owned local DB
  5. METRC integration + inventory database + reporting layer (Renee joins)
  6. Custom yield metrics AROYA can't surface (trim wet weight, per-strain/room)
  7. Argus safety architecture + shadow-mode read-only loop on one fallow room
  8. Supervised control + kill-switch drill on that room
  9. Ops handoff + on-call playbook so Klutch runs it without Cian
  10. Graduation review + co-authored next-90-day roadmap
Source: draft 19f429bf0c4212f0 (curriculum preview, 2026-07-08 — unsent).

4. Financial State

ItemStatusDetailSource
Retainer — $5,000 / ~33 hrRECEIVEDAdam kicked off ACH 2026-07-01 13:07 ET; Stripe microdeposits verified by Neal 2026-07-06gmail hth 19f37ba64e5d7d24
W-9 — High Tech Horticulture LLCSENT2026-07-16 18:17 PT from personal gmail → Mike.Lentz@klutchcannabis.com · EIN 99-1672717 · attach HTH-W9-Klutch-SIGNED.pdfgmail personal 19f6da627ccaebbb
Vendor-setup ack from Klutch APPENDINGW-9 sent 12 days ago; no ack from Mike or Neal yet
Rate$150/hrHeld. No discount offered; 3-month upfront commit path if Mike asks6/29 scope-review brief
Hours burned~1 hr est.6/29 scope call (30 min) + async coordination. S1 prep logged separately per HTH boundary. 32 hr remaining.self-tracked

5. Deliverables

ArtifactOwnerStatusNotes
Shared GitHub repo (template)CianCOMMITTEDSuggested hth-klutch/klutch-ai-stack, README + CODEOWNERS + branch-protection + docs/ agents/ integrations/
Claude Code install on Rob's Ubuntu VMRob (Cian coach)S1/S2Blocked on S1 reschedule
30-day anchor pick (AROYA→METRC vs Argus shadow)Rob + MikeS1/S2Default AROYA→METRC if they can't decide
Curriculum preview email (10 sessions across 31 hrs)CianDRAFTEDDraft 19f429bf0c4212f0 from 2026-07-08 — not sent. Consider sending as part of reschedule note.
Modbus-vs-UI one-pager (Argus)CianPLANNEDFor Phase 3. Steer Rob away from UI-scraping if it resurfaces.
One-page SOWCianOPTIONALOnly if procurement asks. Mike hasn't requested one.
Weekly recap email to MikeCianPENDINGFormat: 3-line — session done / anchor / next date / hours remaining

6. Open Questions Log

QuestionOwnerStatus
Argus controller model + generation on-site?Rob (Klutch)OPEN
Argus control LAN reachable from Rob's Hyper-V VM subnet, or VLAN-isolated?Rob (Klutch)OPEN — known landmine
Who besides Rob will be in this code day-to-day? Anyone at Klutch coding Python / using Git?Rob (Klutch)OPEN
Retainer / invoice cadence — how does Mike want to see burn-down (monthly summary email? dashboard?)Mike (Klutch)OPEN
Beyond Mike + Rob, who at Klutch needs updates? George? Anyone at Habitat?Mike (Klutch)OPEN
What's the "yes this is working" signal at 30 days that unlocks Phase 2 hours?Mike (Klutch)OPEN
METRC read-only reporting — parity with Power BI or replacing it?Mike/George (Klutch)OPEN
Inventory DB — single source of truth or analytics layer on top of SaaS+spreadsheet bridges?Mike/George (Klutch)OPEN
Where should reports/dashboards land — SharePoint / Slack-Teams / PDF email / bookmarkable web page?Mike/Rob (Klutch)OPEN
Addium/HTH conflict-of-interest note — formalize now or wait?CianBLOCKED — pending decision
StashStock API integration path — does Klutch want to route METRC through StashStock or direct?Rob + Renee (Klutch)OPEN — surfaced 7/10

7. Risks & Landmines

8. Follow-up Draft Staging

Auto-Cc reminder

Before composing: read /Users/ciansullivan/claude-brain/09-Handoffs/klutch-stakeholders.yaml. Cc floor is Mike.Lentz + rob.walker + George.Strickler @klutchcannabis.com unless Cian names a smaller subset.

Draft #1 — S1 reschedule apology (READY TO SEND)

Existing draft: gmail hth 19fa9de3314a438b · currently to Rob, Cc Mike + George — ✅ matches ALWAYS floor
Hello everyone,

My apologies for the missed meeting time today — the fault is mine on not getting everyone's emails onto the invite while I was driving yesterday. Can we relock a 60-min block later this week or early next?

Cian's open Pacific windows (Eastern in parens for you):
  • Thu 7/30 · 8:30–9:30 AM PT (11:30 AM–12:30 PM ET)
  • Fri 7/31 · 8:30–9:30 AM PT (11:30 AM–12:30 PM ET)
  • Tue 8/4 · 8:30–9:30 AM PT (11:30 AM–12:30 PM ET)

Pick whichever fits Rob + George, and I'll send a fresh invite (this time with all three of you on it). Structure will be the four-block plan I sent you privately: sandbox walk → shared repo + Claude Code on the VM → 30-day anchor pick → open Argus / network questions.

Retainer clock is unaffected — the no-show is on me, not the burn.

Cheers,
Cian
Cian — verify the offered slots against phone cal + Spokane flight before sending. Edit inline above; the draft body auto-persists.

Draft #2 — W-9 receipt nudge (SUGGESTED)

Suggested to: Mike.Lentz + Neal.Ritondaro @klutchcannabis.com · Cc Rob + George (ALWAYS)
Hey Mike, Neal —

Circling back on the W-9 for High Tech Horticulture LLC that went to your inbox on 7/16 (from ciansul@gmail.com, subject "W-9 — High Tech Horticulture LLC", EIN 99-1672717). No urgency — just want to confirm your AP team has what it needs for vendor setup so nothing sits.

If you need it re-sent or want the packet forwarded to accounting@klutchusa.com directly, say the word.

Cheers,
Cian

9. Sources & Cross-references